I was watching the following Microsoft Webcast
IT Manager Webcast: How Microsoft IT Manages Vendor Development Projects (Level 300)
Lots of interesting sheets, graphs and tracker. Also, liked the following phases listed in Development Project. This can act as a Ready Reckoner.
- REQ - Requirements
- HLD - High Level Design (e.g. FSPEC)
- HLDINSP - High Level Design Inspection
- DLD - Detail Design
- DLDR - Detail Design Review
- DLDINSP - Detail Design Inspection
- TCR - Test Case Review
- CODE - Coding
- CR - Code Review
- UT - Unit Test
- CODEINSP - Code Inspection
- IT - Integration Testing
- ST - System Testing
- PM - Post-mortem
- STRAT - Strategy (e.g. Vision/Scope)
- PLAN - Planning, Project Management
- UAT - User Acceptance Test
- PL - Product Live
No comments:
Post a Comment